Medium RiskOpen

Roof-specific report

Roof 9: Wake Forest / BUR

Aged BUR restoration candidate that needs updated condition confirmation and a clear quote path before proposal delivery.

Roof area

68,361 SF

Square footage from the source model roof tab.

Risk score

47/100

Normalized condition, failure likelihood, and impact score.

Recommended action

Restore

Restoration is disproportionately valuable because failure would be cumbersome and high-liability around PTIC offices, elevator, utilities, and multi-floor functions.

Condition worksheet

Technical scoring carried from the roof tab

Physical Condition

60/100

Moisture Presence

72/100

Deck Integrity

68/100

Leak Activity

66/100

Space Criticality

65/100

Refresh IR/condition testing to confirm restoration economics.
Medium criticality allows sequencing, but deferral still risks losing the lower-cost option.

Financial worksheet

Budget and timing logic

Selected plan

Restore

$376K currently modeled for 2026.

Lifecycle exposure

$378K

Selected spend plus any modeled deferral liability.

IR-adjusted decay

Accelerated Candidate

Moderate BUR / aged | IR tier: Moderate (1.25% estimated wet); annual decay 11.2%.

Owner question

This page does not force one recommendation. It shows the consequence of this roof’s maintain, repair, restore, retrofit, replace, or defer path over time.

IR takeoff worksheet

Moisture signal translated into capital timing

Roof 9Moderate IR tier1.25% estimated wet

Schematic drawing is a planning placeholder until the exported NIRA takeoff table or marked-up drawing is supplied.

Roof-specific NIRA snippet

Roof 9 scan crop placeholder

Reserved for the thermal/NIRA image crop that corresponds to Roof 9. When supplied, this slot should show the scan snippet used to verify wet SF, anomaly count, and urgency tier.

IR category

Moderate

Color/tier used in dashboard legend and active prioritization.

Estimated wet area

855 SF

1.25% of this roof area; editable placeholder until NIRA export is provided.

Anomalies

6

Survey reference: 2025-02-04; Placeholder confidence.

Decay modifier

1.12x

Modifier applied to annual deterioration in capital-window and deferral calculations.

Moderate timing tier

Moderate moisture-risk placeholder; confirm with updated IR before final restoration quote.

Source: NIRA visual thermal model + workbook/PDF qualitative note: aged BUR

Photos and evidence

Roof photo placeholders

These are designed as proposal-ready slots. Replace each placeholder later with roof photos, IR images, test-cut photos, warranty documents, or annotated plans.

BUR condition overview

Attach roof field and detail photos.

Placeholder

Moisture verification

Attach IR/test-cut backup.

Placeholder

Repair scope areas

Attach photos tied to quote line items.

Placeholder

Capital action options

Owner decision alternatives

Repair

Prepare for restoration

Needed

Financial consequence: Prepare for restoration. This is one path in the time-based model; scope follows: Detail repairs, wet-area corrections, and substrate preparation.

Budget basis: $30K

Restore

Lower lifecycle cost

Needed

Financial consequence: Lower lifecycle cost. This is one path in the time-based model; scope follows: Restoration/coating system based on workbook allowance.

Budget basis: $376K

Replace

Fallback if restoration criteria fail

Budgetary

Financial consequence: Fallback if restoration criteria fail. This is one path in the time-based model; scope follows: Replacement budget alternative for capital planning.

Budget basis: $1.71M

Quote attachments

Proposal backup placeholders

Restoration proposal

Vendor: TBD

Open
$190K–$225K Attach quote later

Replacement fallback

Vendor: TBD

Open
$450K–$525K Attach quote later