High RiskLost

Roof-specific report

Roof 8: Ballast EPDM & TPO

Poor-condition ballasted roof where replacement/retrofit assumptions need validation before major capital is committed.

Roof area

174,040 SF

Square footage from the source model roof tab.

Risk score

70/100

Normalized condition, failure likelihood, and impact score.

Recommended action

Maintain / Defer until rentability shift

Poor ballast EPDM/TPO with low rentability; revised workbook says damage exists on concrete deck but no imminent threat to additional damage, so maintenance/deferral can be appropriate until rentability changes.

Condition worksheet

Technical scoring carried from the roof tab

Physical Condition

50/100

Moisture Presence

58/100

Deck Integrity

62/100

Leak Activity

55/100

Space Criticality

65/100

Confirm whether ballast, EPDM/TPO interfaces, and tenant needs allow phased work.
Low confidence budget should be tightened with contractor scope and current survey.

Financial worksheet

Budget and timing logic

Selected plan

Replace

$2.18M currently modeled for 2026.

Lifecycle exposure

$2.18M

Selected spend plus any modeled deferral liability.

IR-adjusted decay

Accelerated / Poor

Poor ballast EPDM/TPO | IR tier: Significant (2.25% estimated wet); annual decay 15.0%.

Owner question

This page does not force one recommendation. It shows the consequence of this roof’s maintain, repair, restore, retrofit, replace, or defer path over time.

IR takeoff worksheet

Moisture signal translated into capital timing

Roof 8Significant IR tier2.25% estimated wet

Schematic drawing is a planning placeholder until the exported NIRA takeoff table or marked-up drawing is supplied.

Roof-specific NIRA snippet

Roof 8 scan crop placeholder

Reserved for the thermal/NIRA image crop that corresponds to Roof 8. When supplied, this slot should show the scan snippet used to verify wet SF, anomaly count, and urgency tier.

IR category

Significant

Color/tier used in dashboard legend and active prioritization.

Estimated wet area

3,916 SF

2.25% of this roof area; editable placeholder until NIRA export is provided.

Anomalies

11

Survey reference: 2025-02-04; Placeholder confidence.

Decay modifier

1.25x

Modifier applied to annual deterioration in capital-window and deferral calculations.

High timing tier

Moderate-high moisture risk and poor condition justify scope validation before major replacement capital is committed.

Source: NIRA visual thermal model + workbook/PDF qualitative note: poor ballast EPDM/TPO

Photos and evidence

Roof photo placeholders

These are designed as proposal-ready slots. Replace each placeholder later with roof photos, IR images, test-cut photos, warranty documents, or annotated plans.

Ballast field overview

Attach ballast and membrane overview photos.

Placeholder

EPDM/TPO transitions

Attach seams and interface photos.

Placeholder

Problem areas

Attach ponding, damage, or leak evidence.

Placeholder

Capital action options

Owner decision alternatives

Repair

Stabilize while validating scope

Needed

Financial consequence: Stabilize while validating scope. This is one path in the time-based model; scope follows: Localized repairs and leak-control allowance.

Budget basis: $50K

Retrofit

Evaluate lower-cost alternative

Needed

Financial consequence: Evaluate lower-cost alternative. This is one path in the time-based model; scope follows: Retrofit allowance if existing assembly and attachment can support it.

Budget basis: $1.37M

Replace

Reset poor-condition roof

Budgetary

Financial consequence: Reset poor-condition roof. This is one path in the time-based model; scope follows: Replacement budget pending contractor validation.

Budget basis: $2.18M

Quote attachments

Proposal backup placeholders

Replacement proposal

Vendor: TBD

Open
$1.20M–$1.40M Attach quote later

Retrofit alternate

Vendor: TBD

Open
$975K–$1.10M Attach quote later
Return to dashboard