Medium RiskAt Risk

Roof-specific report

Roof 3: Duro-Last Section

Aging PVC/hail-damage area where decision quality depends on claim validation and repair-versus-replacement economics.

Roof area

38,098 SF

Square footage from the source model roof tab.

Risk score

46/100

Normalized condition, failure likelihood, and impact score.

Recommended action

Replace / Claim Validate

Accurate workbook metadata and IR/photo context; 0-4 year window, low rentability, and hail/age conditions support claim validation and staged capital rather than urgent high-rentability work.

Condition worksheet

Technical scoring carried from the roof tab

Physical Condition

60/100

Moisture Presence

70/100

Deck Integrity

72/100

Leak Activity

64/100

Space Criticality

45/100

Confirm hail-related scope, roof warranty status, and insurable damage basis.
Low business impact may justify staged capital if leak risk remains controlled.

Financial worksheet

Budget and timing logic

Selected plan

Replace

$476K currently modeled for 2026.

Lifecycle exposure

$479K

Selected spend plus any modeled deferral liability.

IR-adjusted decay

Linear / Aging Single-Ply

Hail damage / age | IR tier: Moderate (1.50% estimated wet); annual decay 9.2%.

Owner question

This page does not force one recommendation. It shows the consequence of this roof’s maintain, repair, restore, retrofit, replace, or defer path over time.

IR takeoff worksheet

Moisture signal translated into capital timing

Roof 3Moderate IR tier1.50% estimated wet

Schematic drawing is a planning placeholder until the exported NIRA takeoff table or marked-up drawing is supplied.

Roof-specific NIRA snippet

Roof 3 scan crop placeholder

Reserved for the thermal/NIRA image crop that corresponds to Roof 3. When supplied, this slot should show the scan snippet used to verify wet SF, anomaly count, and urgency tier.

IR category

Moderate

Color/tier used in dashboard legend and active prioritization.

Estimated wet area

571 SF

1.50% of this roof area; editable placeholder until NIRA export is provided.

Anomalies

5

Survey reference: 2025-02-04; Placeholder confidence.

Decay modifier

1.15x

Modifier applied to annual deterioration in capital-window and deferral calculations.

Moderate timing tier

Estimated placeholder based on age and hail-damage risk; replace with exported NIRA takeoff when available.

Source: NIRA visual thermal model + workbook/PDF qualitative condition

Photos and evidence

Roof photo placeholders

These are designed as proposal-ready slots. Replace each placeholder later with roof photos, IR images, test-cut photos, warranty documents, or annotated plans.

Hail impact examples

Attach close-up condition photos.

Placeholder

PVC seam condition

Attach seams, laps, and patch details.

Placeholder

Interior/tenant sensitivity

Attach below-deck or impacted area reference.

Placeholder

Capital action options

Owner decision alternatives

Repair

Control active defects while validating claim

Needed

Financial consequence: Control active defects while validating claim. This is one path in the time-based model; scope follows: Targeted membrane repairs and seam/patch stabilization.

Budget basis: $3K

Retrofit

Lower-cost capital reset

Needed

Financial consequence: Lower-cost capital reset. This is one path in the time-based model; scope follows: Overlay/retrofit pending attachment, deck, and warranty validation.

Budget basis: $299K

Replace

Remove aging PVC risk

Budgetary

Financial consequence: Remove aging PVC risk. This is one path in the time-based model; scope follows: Replacement allowance based on workbook budget.

Budget basis: $476K

Quote attachments

Proposal backup placeholders

Claim validation / repair quote

Vendor: TBD

Open
Attach quote Attach quote later

Replacement budget quote

Vendor: TBD

Open
$350K–$425K Attach quote later