Low RiskOpen

Roof-specific report

Roof 2: Lower Walker

Good coated roof with low current risk; capital plan should preserve condition and avoid unnecessary replacement spend.

Roof area

18,190 SF

Square footage from the source model roof tab.

Risk score

26/100

Normalized condition, failure likelihood, and impact score.

Recommended action

Monitor

Good Gaco silicone asset with active warranty; revised workbook supports monitor/maintenance through the remaining warranty balance rather than replacement capital.

Condition worksheet

Technical scoring carried from the roof tab

Physical Condition

90/100

Moisture Presence

95/100

Deck Integrity

88/100

Leak Activity

90/100

Space Criticality

65/100

No thermal anomalies reported in prior scan.
Limit traffic and refresh minor coating/penetration details as needed.

Financial worksheet

Budget and timing logic

Selected plan

Monitor

$0 currently modeled for 2026.

Lifecycle exposure

$13K

Selected spend plus any modeled deferral liability.

IR-adjusted decay

Linear

0% wet 2023 | IR tier: None (0.00% estimated wet); annual decay 2.8%.

Owner question

This page does not force one recommendation. It shows the consequence of this roof’s maintain, repair, restore, retrofit, replace, or defer path over time.

IR takeoff worksheet

Moisture signal translated into capital timing

Roof 2None IR tier0.00% estimated wet

Schematic drawing is a planning placeholder until the exported NIRA takeoff table or marked-up drawing is supplied.

Roof-specific NIRA snippet

Roof 2 scan crop placeholder

Reserved for the thermal/NIRA image crop that corresponds to Roof 2. When supplied, this slot should show the scan snippet used to verify wet SF, anomaly count, and urgency tier.

IR category

None

Color/tier used in dashboard legend and active prioritization.

Estimated wet area

0 SF

0.00% of this roof area; editable placeholder until NIRA export is provided.

Anomalies

0

Survey reference: 2023 prior scan / 2025 model context; Survey-Derived confidence.

Decay modifier

0.95x

Modifier applied to annual deterioration in capital-window and deferral calculations.

Low timing tier

Clean scan supports monitor/maintenance rather than replacement capital.

Source: Workbook/PDF note: 2023 scan clean

Photos and evidence

Roof photo placeholders

These are designed as proposal-ready slots. Replace each placeholder later with roof photos, IR images, test-cut photos, warranty documents, or annotated plans.

Coating field condition

Attach general membrane condition photo.

Placeholder

Penetration details

Attach pipe/curb/edge condition photos.

Placeholder

Drainage paths

Attach low-point and drain photos.

Placeholder

Capital action options

Owner decision alternatives

Monitor

Avoid unnecessary capital

Budgetary

Financial consequence: Avoid unnecessary capital. This is one path in the time-based model; scope follows: Inspection program and minor maintenance allowance.

Budget basis: $0

Repair

Extend current coating performance

Needed

Financial consequence: Extend current coating performance. This is one path in the time-based model; scope follows: Localized coating touch-up, flashing repairs, and sealant work.

Budget basis: $0

Quote attachments

Proposal backup placeholders

Maintenance allowance

Vendor: TBD

Open
$15K–$30K Attach quote later

Coating touch-up quote

Vendor: TBD

Open
Attach quote Attach quote later
Return to dashboard